Mantha Group
Eskom Komati Power Station
  • Configuring SIEMENS-T3000 SWOP OUT SERVER at Komati Power Station



SIEMENS SPPA-T3000 System Admin

  • Perform PI Image
  • File Backups
  • Update PI tag list where required
  • Perform Simulator Image file backups
  • Configure reliable network system and start up sequence for the simulator
  • Set Up a Reliable NAS system for DCS historian and third party PLC backup system


Kendal Power station Ash Spreader PLC Restoration

  • Crawler PLC Panel restoration ( Panel Wiring, and testing)
  • Crawler S7 PLC backup reloading and function testing
  • FAT Testing
  • Drawings and documentation


Kendal Power station Ash Spreader Restoration (Engineering and

Commissioning)

  • Field instrumentation engineering.
  • Field I/O channel assignments.
  • Loop checking and commissioning.
  • S7 program changes to include Conveyor belts protection.
  • Drawings and documentation